A. Purpose.
Exclusion: Special Projects are not covered in this procedure, as they require authorization to utilize University special project funds. Contact the VCBA office for specific procedures and requirements regarding this process.
2. Departmental Services.
The Physical Plant office will render services
upon request, with the cost charged to the requesting department. Examples
include:
Charges to a requesting department are processed by the Facilities Administration Department within two (2) business days after receiving the completed work order from Physical Plant. Departments are charged electronically and notified via a Notification of Charge. Charges reflect the cost of materials, labor, and associated contract costs. Questions regarding charges should be made to the Facilities Administration at extension 3622.
3. Corrective Maintenance/Repair.
Corrective maintenance/ repair is the periodic
or scheduled work required to preserve or restore a facility to such condition
that it may be effectively utilized for its designated purpose. Corrective
maintenance/repair may also involve the restoration of a facility so that
it may be effectively utilized for its designated purposes by overhaul,
reprocessing, or replacement of constituent parts or materials which have
deteriorated by action of the elements or usage. Corrective maintenance/repair
may or may not require immediate attention. In general, a request for corrective
maintenance/repair to a building or building support system is considered
plant services.
4. Work Requests.
A UNCW Physical Plant Work Request from
the departmental budget authority should be used in all cases where the cost
of the work performed will be
charged to the department. Go to the UBusiness site at https://busaff.uncw.edu/ubusiness/login.cfm to enter your request.
5. Movable Equipment.
Movable equipment covered by a warranty or maintenance
contract should be repaired under the terms stated within those contracts.
These files are maintained in the Purchasing Office.
If the movable equipment is not covered by a warranty or maintenance contract, the department may elect to have the repairs performed by an outside vendor/manufacturer or by the Physical Plant Department. See procedure statements for additional detail.
6. Fixed Equipment.
Fixed equipment (equipment that is considered
an integral part of the building or building operating system) covered
by a warranty or maintenance contract should be repaired under the terms
stated within those contracts. These files are maintained in the Physical
Plant office.
If the equipment is not covered by a warranty or maintenance contract, the Physical Plant Department will determine whether the repairs should be performed in-house or by an outside vendor.
- Notify the Physical Plant by accessing the
UBusiness site at https://busaff.uncw.edu/ubusiness/login.cfm and describe as specifically as possible the location and nature of the problem.
- A work order number will be provided at this
time and should be used by the
department if future contact
is needed regarding the same problem.
- The Physical Plant office will determine if
any warranties or maintenance contracts are applicable.
- A Physical Plant crafts worker will be dispatched immediately
if an emergency situation exists requiring quick action
to prevent loss or damage to state property, restore disrupted essential services, or eliminate hazards
to personnel or equipment. Otherwise, the work will be scheduled appropriately.
2. Repairs of Movable
Equipment Under Warranty.
The following actions should be taken if the
department believes that the repair needed is covered by a warranty:
- Purchasing Services should be contacted and
the repairs needed described over the
phone.
- Purchases Services will research the warranty
files.
- If a warranty is in effect, Purchasing Services
will contact the vendor to receive instructions.
- Purchasing Services will contact the department
by phone and provide any necessary
instructions.
3. Repairs of Movable
Equipment Covered by Maintenance Contracts.
The following actions should be taken if the
repair is covered by a maintenance contract:
- Purchasing Services should be notified by telephone
of the equipment manufacturer,
make, model number, and repair problem.
- Purchasing Services will contact the vendor
and request the repair under the maintenance
contract.
- Purchasing Services will contact the department
by telephone and provide any necessary
instructions.
- Any invoices resulting from service calls or
repairs under a maintenance contract are
directed to Purchasing Services for approval
prior to payment.
4. Repairs of Movable Equipment
made by an Outside Vendor or Manufacturer.
The following actions should be taken if the
movable equipment is not covered by a warranty or maintenance contract
yet an outside vendor or manufacturer is needed to perform the repairs:
- A purchase requisition should be prepared (see
Procedure PUR 1.10), indicating the type
to indicate a contact person.
(Note that the department should not contact a vendor or manufacturer to request a repair
before a purchase requisition has been processed by Purchasing Services.
- Upon receipt of the requisition, Purchasing
Services will issue a purchase order for the
repair and follow up on the purchase
order until the repair has been satisfactorily
completed.
5. Work Requests.
The following actions should be taken with regard
to a work request to perform repair utilizing Physical Plant personnel:
- Complete Section I of the Work Request form
and distribute copies of form.
- If an estimate is requested, the estimate will
be provided on the Work Request form
(in Section II), and the form returned
to the requesting department for approval.
- The decision of the requesting department regarding
the estimate will be indicated on the
Work Request form (in Section III)
and the form distributed per preparation instructions.
- Upon receipt of this authorization, the Physical
Plant office will purchase materials, schedule
the work, and inform the department
by telephone as to the date that work will
commence.
- A Notification of Charge (with material listings
and work order copies as supporting
documentation) will be forwarded
to the requesting department upon completion of the
work.
NOTES: If the requesting department desires to change the scope of the work to be performed, a memorandum should be forwarded to the Physical Plant Administrative Office stating the changes needed and requesting a new estimate (if desired). The memorandum should be signed by the appropriate Department Head, Dean, or Vice Chancellor.
If the Physical Plant Office determines during the course of the project that additional work is needed (which was not covered in the original scope), a memorandum will be drafted to the individual department stating the changes needed, estimated additional costs, and requesting authorization to proceed with this work.
Instructions for Preparation of Form PHY 1.20 Effective: January 12, 2004
Name of Form: UNCW Physical Plant Department Work Request (Form CD-0026)
A. Purpose.
1. Estimate was Requested in Section I. The original and a copy of the form should be forwarded to the Physical Plant Administrative Office. (A photocopy of the form may be made for departmental records.) Physical Plant (or Project Design) will complete Section II and return the original of the form to the requesting department. The requesting department will review the estimate, complete Section III to indicate the departmental decision regarding the estimate, and return the original of the form to the office that prepared the estimate in Section II. The requesting department will retain a copy for departmental files.
2. No Estimate was Requested in Section I. Retain a copy for departmental records and forward the original to the Physical Plant Administrative Office.